Hitachi GR2000 Series Manual do Utilizador Página 273

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 272
Maintenance Procedure
GR2K-GA-0015 8-11
Ver. 07-02
Step 2. Remove the standby BCU.
Figure 8-10 shows the procedures for removing the standby BCU. Removing
the standby BCU must be performed in the order of RM-I/O, RM-CPU, and
CSW (GR2000-20H only).
Figure 8-10 Procedure for Removal of Standby BCU
!
WARNING: Hazardous voltage. Can cause death or severe injury. Removing/adding component
while power is on must be conducted by trained and qualified engineer or
maintenance personnel.
Remove the MC card installed on the standby BCU RM-I/O board.
Remove the RM-I/O board from the standby BCU.
Note: If the MC card is removed during MC access, it might fail;
check the MC card access LED.
Remove the RM-I/O board from the standby BCU.
Remove the CSW from the standby BCU.
Note: The last step is required only for the GR2000-20H.
Vista de página 272
1 2 ... 268 269 270 271 272 273 274 275 276 277 278 ... 327 328

Comentários a estes Manuais

Sem comentários